Caterpillar 349GC

Confirm the Exact Unit Before Purchase
This listing is an enquiry starting point. Request current photos, video, available inspection material, and written commercial terms for this specific machine.
Technical Specifications
The 2023 Caterpillar 349GC at 850 hours is offered as a 48.5 Tons unit with the CAT C13 ACERT and the standard 3.1 m³ bucket. The inspection package includes the HMP unit-specific inspection material with dated photographs, a rollback-checked hour meter, and an optional live walk-around before deposit. Written CIF quotes for Nigeria, Kenya and the wider region are issued after your enquiry is reviewed and locked for seven days.
Full Technical Data
Inquire via WhatsApp
Chat directly with our yard specialist for the best wholesale CIF/FOB price.
Get CIF/FOB Quote for Caterpillar 349GC
Pre-filled wholesale inquiry for model CAT107.
Product Overview
2023 Caterpillar 349GC with 850 hours on the Meter: Unit Overview
The 2023 Caterpillar 349GC at 850 hours is presented as a 48.5 Tons machine with a complete inspection history. The HMP unit-specific inspection material is dated and photographed, the meter reading is listed by rollback detection, and the unit can be inspected live before payment. The sale is structured CIF from Shanghai with the full export documentation pack included.
Engine, Emissions and Drive System
The Caterpillar 349GC is driven by the CAT C13 ACERT developing 311 kW (417 HP). The power unit is listed against the OEM serial records, and the Tier 3 / China Stage III rating is documented in the file. The Full Hydrostatic layout is standard for the class, and the meter's 850 hours reading is cross-checked by ECU scan during the audit. The inspection report logs the engine pressures and temperatures at running temperature.
Digging Performance: Depth, Reach and Breakout
Digging figures for the Caterpillar 349GC: 4.68 m depth, 7.24 m reach, 68 kN breakout force and a swing speed of 11.5 rpm. The 3.1 m³ bucket is matched to the envelope, and the circuit pressure of 34.3 MPa is confirmed during the function test. The audit log records each measured value with a dated photo, so the numbers in this listing are the numbers in the file.
Undercarriage and Track System
This Caterpillar 349GC runs 450 mm shoes across 3.65 m of track at 32 kPa ground pressure. The undercarriage report records Good condition, healthy links and bushings (450 mm shoes), with each wear item measured and photographed. Track tension and alignment were set during the audit, and seal condition was checked on the rollers and idlers. The 48.5 Tons unit stays planted on fill and soft material with this footprint.
Operator Environment and Daily Usability
Inside, the Caterpillar 349GC offers the ROPS / FOPS documented enclosed cab with air conditioning and a control layout suited to full-shift work. The 410 L fuel tank keeps the machine working through long cycles, and 440 mm of ground clearance clears typical site obstructions. The audit verifies the operator station functions, lighting and service access, with the findings photographed and dated in the file.
Where This Caterpillar 349GC Works Best
For port programs, the Caterpillar 349GC brings the 48.5 Tons class and the 3.1 m³ configuration, with sales history into Nigeria, Kenya and the wider region. The machine is inspected under the HMP unit-specific protocol before listing, the file is shared with the buyer, and a live walk-around is arranged after your enquiry is reviewed. The quote is confirmed in writing and held for seven days.
The HMP unit-specific inspection and What Ships in the File
Verification for this Caterpillar 349GC works in layers: the dated unit-specific inspection material, the hour-meter evidence, where available on the 850 hour reading, and a live walk-around where the serial number and meter are shown on camera. The engine serial is cross-checked against the chassis plate. An an independent inspection may be coordinated when the inspector, yard access, and buyer requirements allow before loading for buyers who want an independent opinion.
CIF Shipping and Export Documentation
A written CIF price for Nigeria, Kenya or the wider region is confirmed after your enquiry is reviewed of your request, itemized with ocean freight, port handling and export documentation, and the rate is held for seven days. HMP ships from Shanghai with the full export packet: commercial invoice, packing list, bill of lading, certificate of origin and the inspection report. Container status is shared during transit, and the destination rules are listed with the buyer's broker before loading.
Maintenance Story of This Caterpillar 349GC
This 2023 Caterpillar 349GC at 850 hours carries a documented service record. The audit file logs the oil and coolant analysis, filter service and fluid levels, with date-stamped photos of each check. The maintenance history is part of the sale package, so the buyer knows exactly what was done at the yard before the machine was listed.
What to Verify on This Caterpillar 349GC Before Payment
Before any funds move, buyers can check four things on this 2023 Caterpillar 349GC: the hour-meter evidence, where available for the meter reading of 850 hours, the dated inspection photos of the engine and hydraulics, the serial number shown live on camera, and the written CIF quote itemized for the destination port. The machine is demonstrated live on video after your enquiry is reviewed, and third-party survey can be booked at the yard if you want an independent check.
Cost Profile of the Caterpillar 349GC
Running costs on this Caterpillar 349GC are shaped by the 410 L fuel capacity and the service intervals documented in the file. The HMP report verifies the condition of the components that carry the first-year spend: filters, fluids, undercarriage and hydraulic seals. Buyers review this cost profile in the inspection file before payment.
The Value Story: 850 Hours on a 2023 Model
This 2023 Caterpillar 349GC at 850 hours has passed its break-in and first service cycle while absorbing the largest depreciation step. The CAT C13 ACERT and the working components remain inside their service horizon, and the machine is priced against its documented condition. Buyers in the 48.5 Tons class get the production capacity at a fraction of new-unit cost.
Parts and Service Support After Delivery
Service support for the Caterpillar 349GC continues after the sale: HMP sources parts through its Shanghai, Guangzhou and Hong Kong trade accounts, and the CAT C13 ACERT family has distributor coverage in the target markets. The service schedule is documented in the file, and the technical liaison stays on the order through delivery.
Dig Cycle Analysis for the Caterpillar 349GC
The production profile of this Caterpillar 349GC is built around the 3.1 m³ bucket and the swing rate of 11.5 rpm. The machine digs to 4.68 m and loads through 7.24 m of reach with 68 kN of force at the bucket. The hydraulic system at 34.3 MPa is function-tested in the audit, and the cycle figures are the ones recorded in the file.
Transaction Structure and Regional Support
The purchase runs in a fixed sequence: review the inspection file, watch the live walk-around, sign the sales contract, pay the deposit by TT, and settle the balance against the export documents. The CIF quote is confirmed in writing after your enquiry is reviewed and held for seven days. The technical liaison assigned to the order follows the machine to delivery and remains available for buyers in Nigeria, Kenya and the wider region.
Operator Experiences and Fit Signals
This Caterpillar 349GC is the right pick when the program needs port duty in the 48.5 Tons class, when the buyer cannot inspect the yard personally, and when the decision depends on documented condition. The 2023 build at 850 hours, the CAT C13 ACERT power unit and the full inspection file cover those requirements, and the machine is shown live on camera before payment.
Fleet Standardization on the 48.5 Tons Class
For fleet managers standardizing on the 48.5 Tons class, this Caterpillar 349GC is a repeatable unit: the 2023 build at 850 hours, the CAT C13 ACERT powertrain and the 3.1 m³ bucket cover the standard program, and the inspection file makes the condition review fast. The machine can be added to an existing order cycle without special handling.
Comparing the Paperwork Before You Decide
Buyers evaluating this Caterpillar 349GC against other listings in the 48.5 Tons class should compare the paperwork first: the dated inspection file, the hour-meter evidence, where available on the 850 reading, and the written CIF quote. HMP prepares all three before the deposit is paid, and the machine is shown live on camera during the review.
Spare Parts Picture for the Caterpillar 349GC
The spare-parts picture for this Caterpillar 349GC is covered through HMP trade accounts in Shanghai, Guangzhou and Hong Kong, and the CAT C13 ACERT family has distributor stock in the main target markets. The maintenance schedule provided with the sale lists the service intervals and the parts that fall due at each stage.
Site Logistics and Pre-Delivery Preparation
Site preparation for this Caterpillar 349GC is straightforward: the machine lands with the export documentation pack, and the buyer's customs agent clears the unit against the destination rules. HMP shares the container status during transit and confirms the port requirements before loading. For buyers in Nigeria, Kenya and the wider region, the arrival process is documented end to end.
What Arrives with the Machine
With this Caterpillar 349GC, the buyer receives the machine, the export documentation pack, the dated inspection report, and the maintenance schedule. The hour-meter evidence, where available for the 850 reading and the ECU scan results are part of the file. The technical liaison remains available after delivery for parts and service questions.
Sailing Schedule and Transit Windows
Weather and seasonality rarely delay this class of shipment from Shanghai: the unit loads on an available sailing schedule after the contract is signed, and the transit time to Nigeria, Kenya or the wider region is stated in the written CIF quote. Port charges and documentation are itemized in the same document.
Close-up Mechanical Details




Key Features
- Next-Gen CAT C13 engine delivering high torque and power for heavy digging
- significant cost advantages maintenance costs with extended filter life and grouped service points
- Standard 2D Grade and Payload technologies for higher precision and loading efficiency
- Engine: CAT C13 ACERT rated at 311 kW (417 HP) — original OEM serial number listed against chassis records.
- Machine weight: 48.5 Tons with 3.1 m³ configuration.
- Build year 2023; hour meter reads 850 and the hour-meter evidence, where available ships with the file.
- Work geometry on this Caterpillar 349GC: max dig depth 4.68 m | bucket force 68 kN | hydraulic pressure 34.3 MPa.
- Track speed: 5.5 km/h.
Why Source From HMP?
- HMP files a dated unit-specific inspection for this Caterpillar 349GC with every sales package.
- A live video walk-around of this Caterpillar 349GC is arranged after your enquiry is reviewed, so you verify the unit before paying.
- A written CIF price for Nigeria and Kenya is confirmed after your enquiry is reviewed and held for 7 days, freight and port costs itemized.
- If you want an independent check, HMP books an independent inspection provider for a pre-shipment survey.
- Parts continue to be sourced through HMP trade accounts in Shanghai, Guangzhou, and Hong Kong.
- HMP assigns a technical liaison from its ex-dealer engineering team to every export order.
Frequently Asked Questions
QWhat parts and service support is available for the Caterpillar 349GC after delivery to Nigeria and Kenya?
After delivery, parts sourcing runs through HMP trade accounts in Shanghai, Guangzhou, and Hong Kong, covering the Caterpillar 349GC's consumables and service items for buyers in Nigeria and Kenya.
QHow long does delivery take for the 2023 Caterpillar 349GC to Nigeria and Kenya?
Loading is typically arranged within days of the signed contract, and the 2023 Caterpillar 349GC sails on the next vessel with space to Nigeria and Kenya. The quote states the expected arrival window.
QWhich site conditions does the 2023 Caterpillar 349GC suit best?
The 2023 Caterpillar 349GC suits heavy digging significant cost advantage sites, and its spec sheet — CAT C13 ACERT at 311 kW (417 HP), 48.5 Tons, 3.1 m³ bucket — matches the duty cycle buyers in Nigeria and Kenya run on similar projects.
QWhat would the 2023 Caterpillar 349GC cost landed at a port in Nigeria and Kenya?
The quote for this 2023 Caterpillar 349GC is built from the inspection file, the 850-hour meter, and live ocean freight to Nigeria and Kenya; HMP issues it in writing after your enquiry is reviewed and locks it for 7 days.
QWhat are the payment terms and post-sale support conditions on the 2023 Caterpillar 349GC?
For this Caterpillar 349GC, the sequence is: review the unit-specific inspection material and video, sign the contract, then pay by TT. The balance follows the export documents, and post-sale support terms are written into the signed contract before payment.
Recommended Related Inventory
View All EquipmentRelated Reading
Guides, articles, and market updates relevant to this machine
Hydraulic Breaker Sizing Guide: 20-Ton to 30-Ton Excavators
A technical 2026 guide on matching hydraulic breakers to 20-30 ton excavators: aligning flow rate (LPM), working pressure (Bar), and tonnage class for Caterpillar, Komatsu, and Sany units.
How to Choose a Reliable Used Excavator Supplier
How to identify a truly reliable used excavator supplier in 2026. Explore our 150-point technical audit, original powertrain guarantees, and global logistics framework for Caterpillar, Komatsu, and Hitachi fleets.
The Complete Guide to Buying a Used Excavator from China
A professional end-to-end overview of the used machinery export process. Learn how to source, inspect, pay, and ship heavy equipment with zero mechanical risk.




