120-POINT QUALITY AUDIT
Trust is built on engineering data, not just original paint. Every used excavator in our yard undergoes a mandatory 120-point technical audit to ensure it meets our **'Certified Work-Ready'** status for global projects.
Physical Audit
High-res bore-scope and X-ray inspection of critical structural weldments.
Diagnostic Analysis
Full MATRIS (Volvo), ET (CAT), and KOMEXS (Komatsu) data retrieval.
Performance Test
Simultaneous multifunction cycle time verification under maximum hydraulic load.
Certification
Signed 120-point condition report provided with every wholesale unit.
The Mandatory 120-Point Inspection Matrix
Engine & Power
- Blow-by analysis
- Turbocharger boost pressure
- Oil contamination test
- Radiator thermal stability
Hydraulic System
- Main pump flow cycle times
- Valve bank sweating inspection
- Pilot control responsiveness
- Cylinder rod chrome health
Structural Integrity
- Boom foot weld X-ray
- Chassis X-frame alignment
- Slewing ring lateral play
- Cabin ROPS certification
Undercarriage
- Link height measurement
- Drive sprocket tooth profile
- Idler alignment
- Carrier roller rotation
Engine Blow-by Verification
We don't just check the hour meter. Our engineers perform a professional **engine blow-by test** on every used CAT and Komatsu. By measuring the pressure within the crankcase, we provide scientific proof of piston ring health and cylinder compression.
Digital Diagnostic Proof
For electronic machines (2015+ models), we provide a full digital download of the machine's ECU. This reveals the true life history: high-temp alarms, fuel system alerts, and overall duty cycle intensity.
Inspection Technical FAQ
Can I request an independent third-party inspection (e.g. SGS or Bureau Veritas)?
Absolutely. While we provide our own internal 120-point audit, we fully welcome and will coordinate access for an independent third-party inspection company of your choosing to visit our export yard before final payment.
What does 'A1' actually mean in engineering terms?
Our 'A1' rating indicates that all major mechanical components (Engine, Pump, Valve, Undercarriage) possess at least 90% of their original factory life remaining, and the machine is in original factory paint.
Do you provide video evidence of the performance tests?
Yes, every customer receives a high-definition walk-around video and a 10-minute performance stress test video showing the machine at maximum hydraulic relief pressure.
Request an Inspection Report Today
Don't buy on original paint alone. Get the engineering data you need to secure your project's ROI. Contact us for a certified PDF condition report of any machine in our yard.
